Processing

Project ATMA I (Stmk. Austria)

Processed raw materials:

Food leftovers

approx. 1.500 ton

(10-15 % DS)

Manure

approx. 3.000 ton

(3 % DS)

Industrial offall

approx.500 ton

(3-85 % DS)

Grass

approx. 1.000 ton

(70 % DS)

Maize silage

approx. 1.000 ton

(70 % DS)

Oil, fats

approx. 1.000 ton

(1 % DS)

Summe

approx. 7.040 ton










Raw materials are taken over and hackled in special Take-Over-Station.

After that it is transported over a screw for sanitation. Sanitation consists of two units of 5 m³. The units are equipped with agitators in order to achieve a homogenizing heating up and to avoid local burn ups. Food leftovers are heated up to 75°C (possible heat up to 90°C).

After sanitation leftovers are pumped into Hydrolyse Basin. From there they are brought either to other plants or transported into the own Prefermenter.

Grass, industrial offall and maize silage are firstly crunched and directly transported to prefermenter. Manure and sewage sludge are directly pumped from storage tanks to prefermenter.

In prefermenter (150m³) materials are mixed. Preferably it should be always an alike mixture. In prefermenter substrate is heated up to 50°C (termophile zone). Oxygen is used up by aerobe bacteria and anaerobe process starts.
From prefermenter substrate is taken out daily and fresh substrate is added in the same amount. It serves as a cache buffer before the main fermenter, differences in consistence and within the biological process can be controlled more easily in prefermenter then in main fermenter. Duration time is approx. 4 days.

Along pumping device substrate is brought into main fermenter. One main fermenter will be filled up within a 10 days period. Within this time gas production is starting slowly and reaches its maximum at the end. Fermentation process will take approx. 15 days. Within this time gasing reaches up to 95 %. Within this period the substrate is technically homogenized. After that substrate will sit for approx. 5 days, this is called sedimentation phase. Within this time light substance will swim up and biomass will sink down. In between is a water layer.

By emtying of fermenter first the water will be let out for natural and/or chemical clarification. After this sink layers will be screwed out for dry sedementation into the end-fermenter (dry-fermenter). Whilst first fermenter is within sedimentation and emptying phase, second fermenter is within gas production phase.

Within dry-fermenter substrate is dried up and fully outgased. Product shall have a DS of 80 -87 %.